Elevators and lifts for Pakistani buildings.

Passenger, hospital, freight, panoramic and home lifts, supplied and installed by factory-trained engineers.

G123DriveCounterweight2
Call the lift

Lift at floor 2, doors open.

Lifts by use

The right lift depends on who rides it and how often.

Passenger lifts

Gearless traction lifts for offices, hotels and towers. The 1903 gearless design still sets the standard, and a well-kept machine rarely needs replacing when the controls are upgraded.

Hospital and bed lifts

Large cars for beds and trolleys, with smooth stops and priority controls so patients reach theatres without delay.

Freight lifts

Built for heavy loads, from 1,360 kg to 5,440 kg, for factories, warehouses and basements.

Panoramic and observation lifts

Glass-walled cars on the outside of a building or across an atrium.

Hydraulic lifts

A piston drives the car, so there is no overhead machine. Suited to buildings of up to five or six floors.

Home lifts

Quiet hydraulic lifts that fit in about the space of a closet. They run at any hour without disturbing the house.

Double deck lifts

Two cars stacked in one shaft to move more people in tall, busy buildings.

Steel belts, less energy.

The Otis GeN2 family hangs the car from flat polyurethane-coated steel belts instead of wire ropes. The belts are quieter, about 20 percent lighter and last two to three times longer, and they need no lubrication.

GeN2 Regen returns braking energy to the building. Otis states total energy savings above 50 percent and up to 70 percent.

Glass-walled lift shaft inside a shopping mall

How a lift project runs

One team from survey to service.

  1. Survey

    An engineer visits, measures the shaft and agrees the use, load and number of stops.

  2. Quote

    You receive a specification, drawings and a price for the lift and its finishes.

  3. Install

    Factory-trained engineers install, adjust and test the lift on site.

  4. Handover

    You get a tested lift, the paperwork and a maintenance contract to keep it that way.

Questions owners ask

Which lift suits a building of six floors?

Machine-room-less traction lifts suit most mid-rise buildings. Hydraulic lifts work well up to five or six floors. A site visit confirms the choice against your shaft, load and budget.

Do you supply and install Otis lifts in Pakistan?

Yes. Emfore Corporation has supplied, installed and maintained Otis equipment in Pakistan since 1992, with offices in Karachi, Lahore and Islamabad and projects across Pakistan.

How do I get a price for a new lift?

The price depends on capacity, speed, number of stops and finishes. Send the number of floors, the building use and the city through the form, and an engineer will quote after a survey.

Can a lift go into a building that was built without one?

Often, yes. Machine-room-less lifts need no separate machine room, and the Otis GeN2 Switch was designed for residential buildings built without a lift. Ask us about availability in Pakistan.

Who maintains the lift after installation?

We do, through a maintenance contract. The engineers who install your lift are from the same team that services it.

Planning a new lift?

Send the details and an engineer from the nearest office will call you back. We reply on working days.

Request a quote or a site visit

What do you need? *

Your details go only to Emfore Corporation and are used to reply to this enquiry.

WhatsApp us